Superior Bulk Logistics Photo Gallery
Jan 7, 2009 3:42 PM
Return to article | Return to photo galleries
As many as 40 railcars at a time can be heated with steam at the Arlington TX transload terminal. In all, eleven of the 16 Superior Bulk Logistics transload facilities have railcar heating capabilities.







