
Occupying slightly more than six acres, the new Decatur Kleen wash rack is an impressive foodgrade cleaning facility. Storage tanks on the east side hold incoming wastewater, biological residuals, and wastewater undergoing biological final treatment. Considerable soil stabilization was needed before construction could begin in 2011.







